About

The consultancy born at the intersection of behavioral economics and human experience.

René Studio
AI EXPERIENCE STUDIO

The CX design platform we built from a decade of client work.

Open rene.cx
Mysterya
MYSTERY AUDITS, LIVE

Mystery audits we run, scored live for every location.

Open mysterya.cx
NOW HIRING

Join a team reshaping how the world experiences brands.

View open roles →

COMPANY

GROW WITH US

CONNECT

Services

Comprehensive CX and management consulting for enterprise brands.

René Studio
AI EXPERIENCE STUDIO

Every engagement, mapped and scored in one AI workspace.

Open rene.cx
Mysterya
MYSTERY AUDITS, LIVE

Mystery shopping, scored and evidenced in real time.

Open mysterya.cx
ALL SERVICES

Explore the full range of CX & management consulting services.

Browse all services →

CORE

SPECIALIST

Solutions

Structured solutions that turn CX ambition into measurable outcomes.

René Studio
AI EXPERIENCE STUDIO

Map, score and fix the journeys we redesign, with AI.

Open rene.cx
Mysterya
MYSTERY AUDITS, LIVE

Check the experience you designed is delivered.

Open mysterya.cx
ALL SOLUTIONS

Explore every CX solution we offer.

Browse solutions →

STRATEGY & GOVERNANCE

DESIGN & DELIVERY

CULTURE & EXPERIENCE

Industries

A decade of CX transformation across the region's defining sectors.

René Studio
AI EXPERIENCE STUDIO

Sector-ready journeys, scored by AI in minutes.

Open rene.cx
Mysterya
MYSTERY AUDITS, LIVE

Mystery audits tuned to your sector, scored live.

Open mysterya.cx
ALL INDUSTRIES

See how we work across every sector.

Browse industries →

BUILT ENVIRONMENT

FINANCE & TECH

PEOPLE & MOBILITY

Products

Proprietary tools, platforms, and AI that power CX transformation.

René Studio
AI EXPERIENCE STUDIO

Design, score and fix customer journeys with AI.

Open rene.cx
Mysterya
MYSTERY AUDITS, LIVE

Audit every location and act on what you find.

Open mysterya.cx
REBELDECK A · 36 FORCES

The forces that shape how humans experience the world.

Explore REBEL Reveal →
ALL PRODUCTS

Explore the full Renascence product ecosystem.

Browse products →

AI & TECHNOLOGY

LEARNING & GAMES

PLATFORMS & TOOLS

CX TOOLKIT

Opinion

Insights, research, and conversations at the frontier of CX.

René Studio
AI EXPERIENCE STUDIO

Turn what you read into a journey you can score.

Open rene.cx
Mysterya
MYSTERY AUDITS, LIVE

See what customers really experience, visit by visit.

Open mysterya.cx
ReadExperience JournalArticles & research on CX, behavior, and transformation.Watch & listenExperience LoomOur video podcast on CX & behavior.CuratedCX NewsIndustry news that matters in CX, minus the noise.

Latest articles

Latest episodes

Latest news

Hub

Free tools, templates, and resources to advance your CX practice.

René Studio
AI EXPERIENCE STUDIO

Design, score and fix customer journeys with AI.

Open rene.cx
Mysterya
MYSTERY AUDITS, LIVE

Every visit, every location, every score. Live.

Open mysterya.cx
THE MANIFESTOBurn the Deck.
Ten Virtues. Zero Excuses.Start reading →
THE HUB

Every free tool, template and resource in one place.

Visit the Hub →

AI TOOLS

FREE TOOLS

LEARNING

CULTURE

AI · 15 October 2026

Nvidia Claims Up to 40% of Data Centre Power Is Lost to Failures

Nvidia says data centres can use as little as 60% of drawn power for AI work, with failures and restarts consuming about 10% of every watt. The claims are unverified and accompany a Nvidia–Vertiv efficiency partnership.

Newsdesk
Curated briefing · 2 min read

What happened

Nvidia says data centres can use as little as 60% of the power they draw for actual AI work, with failures and restarts consuming around 10% of every watt, according to TechRadar's reporting. The claim comes alongside a new partnership between Nvidia and Vertiv, which aims to improve data centre efficiency and support the construction of more sustainable facilities.

The central point is the gap between the power a facility draws and the power that reaches productive AI computation. TechRadar attributes part of that gap to failed jobs and restarts, which take energy without delivering finished work.

The source material available for this briefing is limited to the headline and summary. It does not set out a methodology, timeline or the detailed terms of the partnership, so the efficiency figures should be read as Nvidia's claims until they are independently verified.

Why it matters

For organisations building or buying AI capability, compute efficiency is no longer a back-office concern. Wasted power translates directly into cost per training run, cost per inference and how much capacity is available for new AI services. The infrastructure layer now shapes what AI products can be delivered, how quickly, and at what price.

Restarts and failures also matter beyond the data centre. Each interruption at the infrastructure level can delay the output that customers, clinicians, analysts or citizens ultimately receive. Leaders planning AI-enabled services should treat infrastructure reliability as part of the service they promise, not as a purely technical detail.

By the numbers

  • 60% — the share of data centre power that Nvidia says can be used for actual AI work, in the best case cited.
  • 10% — the share of every watt that Nvidia says failures and restarts consume.

The Renascence take

Most coverage will focus on the headline percentages. The more useful question is what sits behind them: how much work is lost, and how often.

The real story here is not the watts, it is the wasted work. Every failed job and restart is a service interruption that someone pays for in time, money and trust, even if the customer never sees it. Loss aversion and visibility both point the same way: a gap that is measured and shown will get managed, and one that is hidden will be quietly tolerated. Operators who want to lead should ask vendors for useful-work-per-watt and restart rates in their service agreements, and treat them with the same seriousness as uptime.

Sources

This briefing was written by our Newsdesk, synthesising reporting from the outlets below. Follow the links for the original coverage.

FAQ

Questions we get on this topic

Nvidia says data centres can use as little as 60% of the power they draw for actual AI work, in the best case cited. The figure is a vendor claim and has not been independently verified in the source material.

Nvidia says failures and restarts consume around 10% of every watt used in data centres, according to TechRadar's reporting. The source does not set out a methodology for this estimate.

The partnership aims to improve data centre efficiency and support the construction of more sustainable facilities. The source material does not include its detailed terms or timeline.

Restarts and failures at infrastructure level can delay the outputs customers receive, so reliability should be treated as part of the service promised. Measuring useful work per watt and restart rates can help operators manage this gap.

Stay ahead of CX

Get the signal, not the noise.

The stories shaping customer experience — plus the Journal and Experience Loom — in your inbox.